Bridge Replacement Trip

On Friday, April 5th, 2013, we will have the unique opportunity to see a bridge replacement using Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS) technology.

GRS is an engineered fill of closely spaced alternating layers of compacted granular fill material and geosynthetic reinforcement.

The IBS is a fast, cost-effective method of bridge support that blends the roadway into the superstructure using GRS technology.  (Hence the reason for the short notice!)

We will meet behind DuPont Hall for a 8:45am departure, and expect to return around 11am.  The trip is limited to SIX students, and sturdy, closed-toe shoes are required!  Students with steel toe boots will be able to get an even closer look.

Any questions can be directed to Matt Carter at matheu@udel.edu.  Sign up now!